Loading site…
Loading site…
Bayport Mitigation at Devils Swamp
Report: met. Eco Pass: transects D1 at 18.9% and A2 at 6.9%, over the 5% limit.
field verifiedpp. 3, 41, 54
Report: met. Eco Pass: burns about 38 and 37 months apart, longer than a 3-year cycle.
agency recordp. 2
Report: no standard covers it. Eco Pass: woody cover on transect D1 up from 29% to 44% in a year.
field verifiedp. 54
Loading the map…
Solid outline: NWFWMD GIS boundary. Dashed: approximate · traced from monitoring report p. 5. No outline is a survey.
46.6 stems/m² in Polygon Bfield verified· no benchmark in the record
To load your site, we need your permit and your latest monitoring report. You get this view back within a week.
Source: NWFWMD, Bayport Mitigation 2025 Monitoring Report (Final) and Mitigation Release Request. Page numbers are PDF pages.
Eco Pass check (Eco Pass assessment, not the report's): The report calls Standard B met (p. 2). Its burn dates, February 2018, April 2021 and May 2024 (p. 2), are about 38 and 37 months apart, longer than the 3 years at the long end of a 2 to 3-year cycle. The report gives the dates by month only. See finding
Eco Pass check (Eco Pass assessment, not the report's): The report calls Standard E met on the 3.9% site average (p. 3). Two of the eight transects are above the 5% limit: D1 at 18.9% (p. 54) and A2 at 6.9% (p. 41). The standard doesn't say whether the limit applies to the average or to each transect. See finding
Financial assurance: none stated in the record. All 5 standards are met.
No operating costs in the record
No capital figures in the record