Scope of work
- Site
- Cypress Point Commerce Center
- Finding
- Upland buffer canopy down 12% since 2023 baseline22% in the upland buffer (remote sensed), benchmark median 30%
- Vendor
- Date
- Nov 17, 2026
Canopy planting, upland buffer in the upland buffer.
- The work
- Canopy planting, upland buffer
- Where
- Upland buffer
- By when
- No deadline set
- Budget guide
- $275–$450 per tree (30 gal)modeled
The work
Canopy planting, upland buffer
Expected effect: At least 90% of planted trees alive at 12 months, and buffer canopy loss against baseline cut to 5% or less at the year-5 remote-sensed canopy assessment.
Specification
Eco Pass standard template- Quantity and unit
- 54 tree (30 gal)modeledplaceholder — not sourced
- Area and location
- Upland buffer, 3.5 ac (fictional) (see the site plan)
- Method
- Plant 30-gallon native canopy trees at the agreed spacing, with mulch rings and stakes removed after one growing season; replace any tree that dies within the warranty period.
- Site access
- Gate on the north service road, open weekdays 7 am to 4 pm; check in at the facilities office before going on site; trucks and equipment stay on the gravel track around the marsh (fictional)
- Site contact
- Facilities manager, Cypress Point Commerce Center, 555-0142, facilities@example.com (fictional)
- Deliverable format
- Completion report (PDF) with the dates, the area worked and the products or materials used
- Before-and-after photos as JPEG with the date and GPS location embedded
- A GIS polygon (shapefile or GeoJSON) of the area worked
- Copies of any licence, permit or prescription the work required
- Evidence acceptance criteria
- All 4 items under "Evidence required on completion" are received.
- Each reading names who collected it, the method used and the date.
- Photos and GIS files carry their date and location, and fall inside the work area.
- This work is accepted when its evidence is complete; the finding closes only when a later result meets the benchmark median, 30%.
Performance target
Canopy cover. Benchmark median, Tampa Bay, light industrial
Target: 30%
Evidence required on completion
- Planting plan with species, size and spacing
- GPS tree inventory
- 12-month live/dead census
- Year-5 canopy assessment against the 2023 baseline
Budget guideGuide only
$275–$450 per tree (30 gal)
modeledSource: placeholder — not sourced