Loading finding…
Loading finding…
Upland buffer canopy down 12% since 2023 baseline
22% in the upland bufferremote sensed· benchmark median 30%
Compared with the regional benchmark; no permit standard covers it.
About $22,000 to closemodeled
Lower risk
Settles the risk before it reaches a standard. No financial assurance depends on it.
22% in the upland bufferremote sensed· benchmark median 30%
(severity × certainty × urgency) ÷ cost band
(3 × 0.6 × 1) ÷ 3 = 0.6
Certainty is how sure Eco Pass is that the finding stands, not how good the evidence is: a finding that evidence is missing scores 1.0 when it is certain the evidence is missing.
Canopy cover · Tampa Bay, light industrial
Collected by Cypress Point Field Ecology (fictional) · method: remote sensing: canopy mapped from aerial imagery against the 2023 baseline
Collected by Cypress Point Field Ecology (fictional) · method: remote sensing: canopy cover classified from aerial imagery
Source: placeholder — not sourced
$275–$450 per tree (30 gal)
Source: placeholder — not sourced
$1,500–$3,000 per assessment