Scope of work
- Site
- Cypress Point Commerce Center
- Finding
- Standard 2: nuisance and exotic cover17% recorded (field verified), above the 10% limit
- Vendor
- Date
- Nov 17, 2026
Field vegetation survey in the created freshwater marsh, by Jan 2, 2027.
- The work
- Field vegetation survey
- Where
- Created freshwater marsh
- By when
- Jan 2, 2027
- Budget guide
- $3,000–$4,200 per surveymodeled
The work
Field vegetation survey
Expected effect: Percent cover of desirable native wetland species and of nuisance/exotic species for each monitoring zone, using the method set in the permit, reported so it can be compared directly with standards 1 and 2.
Specification
Eco Pass standard template- Quantity and unit
- 1 surveymodeledplaceholder — not sourced
- Area and location
- Created freshwater marsh, 6.5 ac (fictional) (see the site plan)
- Method
- Percent cover by species in 1 m² quadrats along fixed transects, the same transects as earlier surveys; nuisance and exotic cover reported against the permit limit.
- Site access
- Gate on the north service road, open weekdays 7 am to 4 pm; check in at the facilities office before going on site; trucks and equipment stay on the gravel track around the marsh (fictional)
- Site contact
- Facilities manager, Cypress Point Commerce Center, 555-0142, facilities@example.com (fictional)
- Deliverable format
- Signed report (PDF) naming the field lead, the method and the dates of the work
- Raw data as a spreadsheet (CSV or XLSX), one row per sample point
- Photos as JPEG with the date and GPS location embedded
- GIS files (shapefile or GeoJSON) for any area or transect mapped
- Evidence acceptance criteria
- All 4 items under "Evidence required on completion" are received.
- Each reading names who collected it, the method used and the date.
- Photos and GIS files carry their date and location, and fall inside the work area.
- The result is checked against at most 10% (Standard 2); the finding closes only if it meets it.
Performance target
Standard 2. Nuisance and exotic species below 10% areal coverage
Target: 10%
Evidence required on completion
- Signed report naming the method and surveyor qualifications
- GPS of transects or quadrats
- Raw data sheets
- Photo station images
Due date
Jan 2, 2027
Budget guideGuide only
$3,000–$4,200 per survey
modeledSource: placeholder — not sourced